Design-build remodeling

Kitchens, baths and whole homes, drawn and built by one team.

We design it, price it and build it. You get one fixed quote, one project lead and a schedule tied to milestones you can check off.

  • One roofDesign and build under one contract
  • Fixed milestonesPaid by stage, not by the hour
  • Every FridayWritten site update with photos
Open kitchen with rift white oak cabinets to the ceiling, a long honed quartzite island and bronze pendant lights Illustrative render

Finished work

Eight recent projects, filtered by room.

Each one shows the weeks on site, the size of the space and what changed. Open a project for the details.

Showing all 8 projects

Illustrative render

On site
Area
Scope

    Concept project. Weeks and areas are illustrative.

    Before & after

    Same room, same camera. Drag to see what changed.

    Before: closed 1990s kitchen with honey oak cabinets, laminate counters and a half wall with a pass-through
    After: the half wall removed, white oak cabinets to the ceiling and a quartzite island facing the dining room
    Illustrative render

    Drag, swipe or use the arrow keys on the handle. Home and End jump to each end.

    Kitchen opened to the dining room

    The half wall with its pass-through came out and the room became one space. Ten weeks on site, with the plans and permit done before demolition.

    • LayoutHalf wall removed, a flush beam carries the load
    • CabinetsRift white oak, flat panel, to the ceiling
    • StoneHoned quartzite island with a waterfall end
    • FinishPlaster hood, bronze pendants, wide oak floor
    Plan before: cabinets on the left and back walls, a half wall with a pass-through between the kitchen and the dining room KITCHENDININGPASS 22'-0"
    A-201 · Plan, before
    Plan after: the half wall removed, tall oak cabinets on the left wall, a sink run under the window and a new island facing the dining room ISLANDDININGCOOKSINK WALL OUT 22'-0"
    A-202 · Plan, after

    Drawings come before demolition. The plan shows which wall comes out, where the new beam sits and how the island lines up with the window, so the permit, the quote and the build all work from the same sheet.

    ExistingRemovedNew

    Schematic, not to scale.

    How a project runs

    Four sheets, in order. You know what happens next at every stage.

    A room mid-remodel with new wall studs, floor protection and a set of drawings on a sawhorse Illustrative render
    1. Step 1, week 0 to 1: Site walk & feasibility

      We measure, photograph and talk budget on the first visit. Within a week you hear plainly whether the project fits and roughly what it costs.

    2. Step 2, weeks 2 to 5: Plans & fixed quote

      Drawings, selections and a fixed-price proposal paid by milestone. The number you sign is the number you pay unless you change the scope.

    3. Step 3, weeks 5 to 9: Permits & materials

      We file permits, order long-lead items and book trades before demolition, so your house is open for as short a time as possible.

    4. Step 4, week 9 on: Build, weekly updates & walkthrough

      One project lead and a written update every Friday. The last payment comes after a walkthrough and a closed punch list.

    A mitered white oak cabinet corner, a honed stone sample and a bronze pull on a dark bench Illustrative render

    The details

    The part you touch every day gets the most attention.

    • Cabinets built in our shopMitered, scribed to your walls, finished before they arrive.
    • Stone templated on siteMeasured after the cabinets are in, so seams land where they were drawn.
    • Hardware you choose in handSamples at the selection meeting, not from a catalog page.

    Where we work

    Within 35 minutes of the shop, so the lead is on site most days.

    • Westbrook12 min
    • Oak Hollow15 min
    • Millbrae Heights18 min
    • Ridgefield20 min
    • Lakeview Terrace24 min
    • Stonegate27 min
    • Brierwood31 min
    • Hawthorne Hills34 min

    Sample service map. On a full build, each town gets its own page with local projects and permit notes.

    Contractor licence
    Licence # — your number hereShown in the footer and on every quote.
    Insurance
    Insurer and liability limit hereCertificate available on request.
    Workmanship warranty
    Your warranty terms hereWritten into the contract, not a handshake.

    Project review

    Tell us the room, the budget and the timing.

    Three short steps. If the project fits, we call within two business days to book a site walk. If it doesn't, we say so and point you to someone better suited.

    • Kitchens usually start around $35k, whole-home work around $120k.
    • No obligation and no sales call before the site walk.
    • Takes about two minutes.
    1. 1 · Project
    2. 2 · Budget
    3. 3 · Contact

    What are you planning?

    Concept demo: nothing is sent. On a live site this connects to your form inbox or CRM.